Skip to main content
Matrix One>Blog>What Is the Difference Between ALM and PLM for Medical Devices?

What Is the Difference Between ALM and PLM for Medical Devices?

Last updated on
ALM vs PLM for medical device development

ALM vs PLM for medical devices comes down to what each system controls. Short answer: an application lifecycle management (ALM) system controls the device software and its design evidence: requirements, risks, tests and the trace between them that IEC 62304 and ISO 13485:2016 clause 7.3 ask for. A product lifecycle management (PLM) system controls the physical product: part numbers, bills of materials, CAD revisions, engineering change orders and supplier data. Software teams need the ALM; hardware and manufacturing teams need the PLM; a device with both usually runs both and hands the released software version to the PLM as a part. Matrix Req is the ALM we build for medical device teams.

We work at Matrix One, the company that builds Matrix Req, so read every product reference on this page as our view. Regulatory statements cite the clause or the FDA page they come from, and product statements cite the matrixone.health page we read on 9 November 2026, so you can check each one.

What is the difference between ALM and PLM?

The quickest way to see it is to ask what the unit of work is in each system. In an ALM it is a requirement, a risk or a test case. In a PLM it is a part number and a bill of materials revision.

QuestionALMPLM
What is the unit of work?A requirement, risk, specification or test caseA part number and its bill of materials revision
What does it control?Device software and the design evidence behind itThe physical product, its parts and its suppliers
Which records does it hold?Trace matrix, test runs, risk file, design reviewsDrawings, BOMs, engineering change orders, supplier data
Which clauses does it serve most?IEC 62304 clauses 5 and 8; ISO 13485 7.3ISO 13485 7.4 purchasing and 7.5 production
Who works in it every day?Software, systems, test and regulatory engineersMechanical, electrical, manufacturing and supply teams
When did the category appear?Early 2000s, for complex software projects1980s, for complex physical products

Both systems manage change and configuration, which is why they get confused. The difference is what is changing: a software requirement and its tests, or a part and the assemblies that use it.

What is a PLM system?

Product lifecycle management emerged in the 1980s to help manufacturing and engineering companies run complex physical product development. In medical devices it controls the lifecycle of products such as implantable devices, diagnostic equipment, surgical instruments, wearables and disposables: what the product is made of, which revision is current, and who supplies each part.

What does a PLM manage?

PLM componentWhat it manages
Product data managementDesign documents, drawings, CAD models and specifications for each part
Change managementEngineering change orders, reviewed and approved before release
Configuration managementWhich revision of every part and assembly is current
Supply chain managementApproved suppliers and the parts they build
Portfolio managementPlanning and resources across product lines
CollaborationShared access for designers, engineers and suppliers
Quality and complianceDefects, corrective actions and regulatory records tied to parts

What is an ALM system?

Application lifecycle management grew up in the early 2000s, when software projects outgrew whiteboards and spreadsheets. An ALM covers the life of a software application from planning and requirements through design, testing and release to maintenance and retirement, and keeps each step traced to the one before. Our guide to ALM systems goes deeper on the category.

What does an ALM manage for medical device software?

ALM componentWhat it managesWhere the requirement comes from
Requirements managementUser needs, system and software requirementsIEC 62304 clause 5.2; ISO 13485 7.3.3
Design and developmentArchitecture and detailed design traced to requirementsIEC 62304 clauses 5.3 and 5.4
Testing and verificationTest cases, test runs and results linked to requirementsIEC 62304 clause 5.7; ISO 13485 7.3.6
Risk managementHazards, risk controls and their verificationISO 14971; IEC 62304 clause 7
Change and configurationControlled changes and versioned baselinesIEC 62304 clause 8; ISO 13485 7.3.9
Documents and releaseReviewed, signed documents and released versionsISO 13485 4.2.4 and 7.3.10

For the risk side, see our ISO 14971 process guide; for the software lifecycle, our IEC 62304 compliance guide.

Why does medical device software need an ALM rather than a PLM?

A PLM is built around parts, so a software requirement, the code that implements it and the test that proves it have no natural home in it. IEC 62304 expects that chain to be traceable, and ISO 13485:2016 clause 7.3.9 expects every design change to be reviewed and verified before it is implemented, which means knowing every test and risk a change touches. That is the ALM's job.

Our own data shows where this breaks. In real feedback from sales calls between February and September 2026, engineering and quality working in separate systems was one of the three most common reasons medical device teams started looking for a tool, after running on Word, Excel and paper and a disliked incumbent tool (Matrix One prospect pain point study, September 2026). Technical buyers also named enterprise ALM that felt too heavy and change impact worked out by hand (Matrix One technical buyer study, October 2026).

Where do ALM and PLM overlap, and where do they hand off?

They overlap on change control and configuration management, and on the idea of a released baseline. They hand off at release: the ALM produces a verified, versioned software build, and the PLM records that build as a part in the device bill of materials, so manufacturing installs the right version.

The design records split the same way. The design and development file that ISO 13485:2016 clause 7.3.10 requires draws its software requirements, verification and risk evidence from the ALM, while the drawings, BOMs and production specifications in the medical device file under clause 4.2.3 usually live in the PLM. Our guide to DHF, DMR, DHR and the other acronyms maps which record holds what.

Does the FDA QMSR change which system holds what?

It changes the standard both systems serve in the US. FDA's Quality Management System Regulation became effective on 2 February 2026 and amends 21 CFR Part 820 to incorporate ISO 13485:2016 by reference. From the same day FDA inspects under compliance program 7382.850 and no longer uses 7382.845 (FDA QMSR page, read 9 November 2026).

So a US device maker now keeps design and production records to the same ISO 13485 clauses as an EU one. The ALM and PLM split does not move, but the records in each are now read against one standard, which makes a clean handoff between the two systems more visible to an inspector.

Do you need an ALM, a PLM or both?

  • Software only device (SaMD): an ALM. There is no bill of materials to manage, and IEC 62304 drives the records.

  • Hardware device with no software: a PLM, plus a way to trace user needs to design outputs under ISO 13485 clause 7.3.

  • Hardware with embedded or connected software: both, with the released software version handed to the PLM as a part.

  • Not sure, or quality records are the real problem: read our comparison of ALM, eQMS and PLM first.

That comparison, ALM vs eQMS vs PLM for medical devices, sorts problems by symptom and ranks the tools in each category.

Matrix Req product requirement linked to its verification test, implementing component and related specification

Screenshot: a product requirement in Matrix Req, from the Matrix Req product page. The requirement is linked to the verification test that proves it, the component that implements it and the specification it relates to, which is the trace a PLM has no place for.

How does Matrix Req work as the ALM next to a PLM?

Matrix Req keeps requirements, specifications, risks and tests in one versioned system. Change one item and it shows every downstream impact; you set which traces are required and it flags broken, missing or outdated links before a reviewer finds them. Risks use ISO 14971 templates and link to the requirement that controls them (Matrix Req product page, read 9 November 2026).

Documents are generated from live project data as a PDF for submission, a Word file for review or an HTML export, with review workflows, electronic signatures compliant with FDA 21 CFR Part 11, and frozen versions for regulatory submissions (technical documentation page, read 9 November 2026). Jira, GitHub and GitLab issues can be created or linked from any item (product page).

Before an audit, the Compliance Checker turns a standard you hold, such as ISO 13485 or IEC 62304, into a checklist evaluated against your project evidence. It finds documentation gaps; it does not certify anything.

What is Matrix Req built for, and what would you run alongside it?

Matrix Req is built for the design side of a medical device: requirements, risk, verification and the documents an auditor reads. It is not a PLM. For part numbers, bills of materials and engineering change orders, a PLM such as Arena PLM or Siemens Teamcenter is built for that job, and that is their strength, not ours. Teams with both run them side by side and hand the released software version across.

What do you need in place before Matrix Req works?

  • A named owner for the requirements structure, who also administers the tool.

  • A decision on which items live in Jira and which in Matrix Req, and the same decision for the PLM: what is a part, and what is a requirement.

  • Your existing trace matrix and specifications exported, so columns and sections can be mapped to Matrix fields with their links.

  • The onboarding sessions booked; the onboarding page lists the packages and what to prepare (read 9 November 2026).

  • A short demo with your own requirements spreadsheet or specification, so you can see how it maps before you commit.

Where can you read more about ALM, PLM and choosing a tool?

Summary: what is the difference between ALM and PLM?

ALM controls the device software and its design evidence: requirements, risks, tests and the trace IEC 62304 and ISO 13485:2016 clause 7.3 ask for. PLM controls the physical product: parts, bills of materials, engineering changes and suppliers. Software only devices need an ALM, hardware only devices need a PLM, and devices with both run both, handing the released software version to the PLM as a part. Since 2 February 2026 the QMSR reads both sets of records against ISO 13485 in the US. Matrix Req is the ALM we build for that design side.

  1. ALM manages requirements, risks and tests; PLM manages parts and BOMs.

  2. Software devices need the ALM trace that IEC 62304 expects; a PLM has no place for it.

  3. Devices with hardware and software run both and hand off at release.

To compare ALM tools for this work, see our ranking of the best ALM tools for medical device development, where Matrix Req ranks first.

Last updated: 9 November 2026.

Questions buyers ask about ALM and PLM

Can a PLM replace an ALM for medical device software?

Rarely. A PLM tracks parts and revisions, so it can store a released software version, but it is not built to trace each software requirement to its design, its tests and its risk controls, which IEC 62304 and ISO 13485:2016 clause 7.3 expect. Most teams that try end up keeping that trace in spreadsheets beside the PLM.

Can an ALM replace a PLM for a hardware device?

Not for manufacturing. An ALM can hold hardware requirements, risks and verification, but it does not manage bills of materials, part revisions or approved suppliers under ISO 13485:2016 clauses 7.4 and 7.5. Use the ALM for design evidence and the PLM for what gets built.

When a requirement changes, how do we see every test and risk it touches?

ISO 13485:2016 clause 7.3.9 expects each design change to be reviewed and verified before it is implemented, which starts with knowing what it affects. In Matrix Req a change to one item shows every downstream impact across requirements, risks and tests (Matrix Req product page, read 9 November 2026). Our change impact analysis guide covers the method.

Is your system validated, and how long does validating it take us?

ISO 13485:2016 clause 4.1.6 requires you to validate software used in the quality management system, and that includes an ALM or a PLM used for design records. For Matrix Req, customers complete the validation pack in about 4 hours on average, a figure our team gives in Matrix Req demos (April 2026).

How do we keep requirements and Jira from drifting apart?

Decide which items live where: requirements, risks and tests in the ALM, development tasks in Jira. Matrix Req lets you create or link Jira, GitHub and GitLab issues from any item, set up during onboarding (product page, read 9 November 2026). Our guide to requirements tools with Jira integration compares the options.

Which system holds the design history file?

Usually neither on its own. The software requirements, verification and risk evidence in the design and development file (ISO 13485:2016 clause 7.3.10) come from the ALM, while drawings, BOMs and production specifications come from the PLM. Generate the ALM half from live data so it matches what was tested.

Does the FDA QMSR mean we need a different ALM or PLM?

No. The QMSR, effective 2 February 2026, incorporates ISO 13485:2016 by reference into 21 CFR Part 820 (FDA QMSR page, read 9 November 2026). Your tools stay the same; check that the records they produce map to ISO 13485 clauses rather than the old Part 820 section numbers.

Written by
Eva Kautenburger
CCO

Eva Kautenburger is Chief Customer Officer at Matrix One, where she leads Customer Success & Supp across the full portfolio of regulatory and quality management solutions for the medical device industry. A certified I. and II. Party Auditor with deep expertise in ISO 13485, EU MDR/IVDR, IEC 62304, and 21 CFR Part 820, she brings both the technical fluency and regulatory grounding that MedTech customers need to navigate complex compliance landscapes. In her role, Eva oversees a cross-functional team of Solution Consultants, Solution Engineers and Account Managers, driving onboarding, retention, support and strategic growth for customers ranging from emerging device companies to global enterprises as well as consulting intiatives to support customers in their regulatory journey.

View profile →

Request a demo and get started today.

See how Matrix One connects your requirements, risks, tests, and documentation in one platform.

Request A Demo Today

Thank you

A member of our team will be in contact within 48 hours.